In the facility of Teta Kazan, one of the well-established companies in the energy sector, in Çumra, steel construction structures suitable for heavy industrial loads and high heat resistance were manufactured by Mak Çelik.

TETA Boiler Energy Plant

TETA KAZAN CUMRA ENERGY AND PRODUCTION FACILITY | Mak Çelik